Reference Project – Energy Onshore

Power & Utilities – Cooling Water Systems and other Utilities
Mobin Utilities Complex – Iran

Project Facts

Client
Sadra

Project Location
Bandar Assaluyeh, Iran

Investment
400 million USD

Foramex Petroleum And Construction ’s Services
45,000 hours

Year
07/2002 – 11/2004

Foramex Petroleum And Construction ’s Scope
Endorsement of basic design
Detailed design
Steady state and transient stress analysis
Preparation of construction tender
Preparation of commissioning and testing procedures

Project Characteristics

The sea water cooling system for a petrochemical plant of the Mobin Utilities Complex has a total water quantity of 500,000 m³/h and pipeline diameter up to 3.0 m.

After endorsement of the basic design for offshore pipelines and facilities Foramex Petroleum And Construction was requested to prepare the detailed design of the entire cooling water system and weirs including equipment and material specifications. Foramex Petroleum And Construction carried out steady state and transient stress analysis.

Within this major project with an investment of approx. 400 million USD Foramex Petroleum And Construction prepared the construction tender as well as commissioning and testing procedures.

The following in-house available disciplines have been involved in the project execution: process, instrumentation & control, pipeline/piping, civil/structural, electric, mechanical, CAE & procurement