Reference Project – Energy Onshore

Power & Utilities – Cooling Water Systems and other Utilities
Cooling Water System for Ribatejo Power Plant – Portugal

Project Facts

Client
Koch

Project Location
Portugal

Investment
million USD

Foramex Petroleum And Construction ’s Services
10,000 hours

Year
09/2001 –08/2004

Foramex Petroleum And Construction ’s Scope
Conceptual design
Basic & detailed design
Hydraulic calculations
Steady state and transient hydraulic analyses
Stress analysis

Project Characteristics

Foramex Petroleum And Construction has prepared conceptual layout, basic & detailed design of a cooling water system including intake for the Ribatetjo Power Plant.


The detail design included the water intakes and outfall, pump stations, headers and surge vessels, buried and over ground 1.8 m diameter pipes in steel and GRP, pressure loss and water hammer calculations, hydraulic calculations of main cooling circuits, detailed stress analysis of headers and mitred bends and equipment specifications.


For the cooling water system for the 3rd turbine of the Power Plant Foramex Petroleum And Construction provided basic and detail design engineering including steady state and transient hydraulic analyses and stress analysis of pipe system. Detail design of steel and concrete structures was also part of Foramex Petroleum And Construction ’s scope.